I plan cutovers for a living. Hospitals. Logistics platforms. M&A separations where both sides have a hard deadline and nobody wants to give an inch.
So when it was time to replace the rooftop air conditioner on my RV, I did what any reasonable person would do. I ran it like a program.
My partner would like the record to show that “reasonable” is doing a lot of work in that sentence.
The scope of this RV air conditioner replacement: swap the Dometic Brisk II for a Furrion Chill Cube 18K ducted unit with a heat pump, and have one wall thermostat run both the new unit and the existing propane furnace. The timeline was a weekend. The location was Las Vegas, in the heat, which is the detail that matters.
One roof. One unit. Same discipline. More sweat than any data center I’ve ever worked in.
The environment was hostile (literally)
Every program has environmental constraints. Mine was that the inside of the trailer was 100 degrees.
That’s not a figure of speech. I’d work inside for a while, then retreat to somewhere with functioning air conditioning, which, given what I was replacing, was not the RV. Then I’d go back in. The install took two days, and a meaningful share of that time was spent cooling off so I could keep making good decisions.
Which brings me to the first lesson, and it isn’t a technical one. Take the break. By the end of day two I was hot, tired and squinting at wire colors I’d already checked three times. Fatigue is how a careful person makes a careless mistake. In enterprise work, this is why you rotate the war room at 3 a.m. On an RV roof, it’s why you drink the Gatorade and sit down.
Research first: read the manual, then find out what’s actually there
Before I touched anything, I did homework. I learned the terminology, read the installation manual cover to cover, and figured out what the new system expected from the trailer.
Then I did the part that matters: I compared what the manual said against what was actually in my ceiling.
Those are rarely the same thing. Anyone who’s inherited an enterprise environment knows the documented architecture and the real architecture are cousins at best.
This time the gap worked in my favor. The manual called for wires to be run directly to the furnace, and those wires already existed in the ceiling. That made the install simpler. I only knew it because I went looking instead of assuming.
It’s the same reason I never take an architecture diagram at face value on an enterprise program. Discovery isn’t only for finding problems. Sometimes it turns up something useful you didn’t know you had, like a perfectly good wire run already sitting in the ceiling.
The dependency nobody puts on the box
The old setup had one clever, sneaky detail. The Dometic’s ceiling control box handled both jobs: it ran the air conditioner, and it relayed the call for heat to the furnace. The AC was quietly acting as the interface between the thermostat and the furnace.
The new unit doesn’t work that way. The old thermostat ran four wires to that control box. The new system needed six. That meant a new cable run, not a quick swap of a few connectors.
I’ve seen the enterprise version of this too many times to count: a component everyone thinks does one job while it’s quietly doing two. Remove it without understanding that, and you find the second job the hard way. On a trailer, the hard way means discovering your furnace stopped working on the first cold night.
Unlabeled wires: a love story
The furnace wires weren’t labeled. Nothing told me which wire was the call for heat and which was power.
I couldn’t guess, and I definitely wasn’t going to find out by touching them together and seeing what happened. That’s not testing. That’s a fireworks show.
So I traced them all the way back to the furnace, underneath the trailer, until I understood the exact wiring. It wasn’t glamorous or fast, and it wasn’t optional. You can’t connect a system correctly if you don’t fully understand the system you’re connecting it to.
Power off means all the power
Here’s a detail that catches people. An RV runs on two electrical systems: 120V AC from shore power and 12V DC from the batteries. Unplugging from shore power doesn’t make the trailer safe to work on. It makes it half safe, which is a terrible kind of safe.
So I used a written checklist for de-energizing everything, AC and DC, and confirmed each item before any wires came apart. Not from memory, and not with “I’m pretty sure I got that one.”
A lockout checklist is boring right up until the day it isn’t.
Write it down so you don’t second-guess yourself
While identifying and labeling every wire, I worked from my checklist and wrote down the full color mapping as I went, marking each connection complete as I made it.
That paid off over and over. In the heat, and tired, I went back to those color codes more times than I’d like to admit. Each time, the answer was on paper instead of in my overheated head.
It’s the same reason I build runbooks for enterprise cutovers. Your memory at hour twelve isn’t your memory at hour one. Write it down while you still trust yourself, so later you don’t have to.
Designing for the failure mode: off-grid heat
There were three supported ways to wire the furnace. I picked the more complex one, deliberately.
The simpler options routed furnace control through the new AC’s controller, which runs on 120V AC power. That’s fine when you’re plugged in. But I camp off-grid, and off-grid there’s no shore power.
The option I chose lets the furnace run entirely on the 12V system, independent of the AC controller. If the 120V side isn’t available, I still have heat.
It was more work up front. The payoff is that the thing you need most when it’s cold doesn’t depend on the thing you’re least likely to have when you’re off-grid. That’s how I think about every critical system: plan for the conditions it actually has to survive, not just the easy case.
Testing heat in Las Vegas: a comedy in several acts
Cooling was easy to test. It was 100 degrees. Done.
Heat was a different story. Testing the heat pump and furnace means asking the thermostat for heat, and the thermostat won’t oblige when it’s already 100 degrees inside. It wasn’t wrong.
So the heat testing moved to the night shift. I waited until late, when the outside temperature finally dropped enough to get the interior under 80 degrees. Even that wasn’t enough of a difference for a meaningful test, so I used a workaround: run the AC for about 35 minutes, cool the trailer down to 72, and then ask it for heat.
Yes, I air-conditioned my RV so I could test whether it could warm itself back up. In the desert. At midnight.
The heat pump and the furnace each needed their own test, and I ran the cycle several times to get clean results and make sure the thermostat was reading the temperature correctly and triggering each source. Cool it down, call for heat, confirm, then do it again for the other one.
Was it efficient? No. Was it validated? Completely. In enterprise terms, this was the post-cutover validation that most teams skip because everyone’s tired and the system “seems fine.” “Seems fine” is not a test result.
The real test came a few weeks later: a four-day camping trip that needed cooling during the day and heat at night. Everything worked as designed. The AC handled the afternoons, the heat took over after dark, and I didn’t have to climb onto the roof, crawl under the trailer or consult a single wire color chart.
After two days in a 100-degree trailer and several midnight heat tests, “nothing interesting happened” was the best possible outcome. In program management, we call that a successful go-live. On a camping trip, we call it a vacation.
Same discipline, different scale
Nobody’s EBITDA was on the line. No clinicians were waiting on a system to come back. My change advisory board was me and a bottle of Gatorade.
The method was still the same:
- Research, then check the documentation against reality
- Map the dependencies, especially the one hiding inside the old hardware
- Make safety a checklist, not a feeling
- Document as you go, so the tired version of you can trust the fresh version
- Design for the real failure mode, like heat with no shore power
- Validate everything, even when that means testing heat at midnight in the desert
The hardware swap was the easy part. The dependencies were the project.
Program management isn’t something you switch on at the office. It’s a way of looking at any system and asking what’s connected that nobody has written down.
Sometimes that’s a hospital. Sometimes it’s a toy hauler in 100-degree heat, and a guy at midnight convincing his trailer that it’s cold.
Andrew Weinberg is a Principal Technical Program Manager with 25+ years in healthcare IT, enterprise infrastructure, SaaS, and M&A integration.